A whole-home renovation is not many small jobs bought at once. It is one sequence, planned in an order that keeps the house standing up and keeps you living in it.

Most houses are asked to hold a life they were not drawn for.

The house was built for somebody else, decades ago, with different assumptions about how many people would be in it and what they would be doing. A whole-home renovation is not an upgrade - it is the point at which the building finally matches the people in it. It is also the largest disruption a family will voluntarily invite into their own home, which is why the plan matters more than any finish in it.

What changes

What you actually get back.

01

The envelope first, always

Roof, flashing, windows and doors before anything decorative. Every finish inside depends on the building being dry, and there is no order in which that stops being true.

See this in a finished kitchen
02

A floor that runs through

One flooring material carried across the whole level, without a threshold at every doorway, is the single change that makes a chopped-up house read as one house.

See this in a finished kitchen
03

Rooms that connect

Usually one or two walls, not many. Which ones can move is a structural question we answer before it becomes a design one.

See this in a finished kitchen
04

You keep living there

Sequenced in zones so the house always has a working kitchen or a working bathroom - rarely both under construction at once, and never without telling you which weeks those are.

See this in a finished kitchen
How it goes

Five steps, and you will know which week is the hard one.

  1. 01

    A conversation

    What the house gets wrong, how long you plan to stay in it, and what the budget actually is. Whole-home scope is decided here.

  2. 02

    We walk the whole house

    Roof, crawlspace, panel, and every room. On a renovation this size the surprises are structural, and they are cheaper to find now.

  3. 03

    Scope, sequence and estimate

    In writing, and phased - so you can see what happens in which month, and which rooms are out of use when.

  4. 04

    We build it in that order

    Envelope, then rough trades, then floors, then rooms. Changing the order is how a renovation doubles in length.

  5. 05

    You get the house back

    Room by room as they finish, not all at the end - so the house becomes liveable again in stages rather than on one distant date.

Materials & craftsmanship

One house, and the year around it.

Two-storey home exterior with fresh paint and mature landscaping
The whole house One building, one sequence Everything on this page happened to a single house over a single run of months. The photograph is small on purpose. At this scale the work is not what you look at - the amount of room around it is, and that is closer to what a renovation of this size actually feels like from inside the house.
Questions homeowners ask

The things people ask before they call.

Can we live in the house during a whole-home renovation?

Usually yes, and most families do. It depends on sequencing rather than on luck: we work in zones so there is a functioning kitchen or a functioning bathroom at almost every point, and we tell you in advance which weeks are the hard ones so you can plan around them.

How long does a whole-home renovation take?

Months rather than weeks, and the honest range depends entirely on scope and on what the walls turn out to be hiding. We would rather give you a phased schedule after walking the house than a number on the phone that we both know is a guess.

Why do you start with the roof and the exterior?

Because every finish inside depends on the building being dry, and because a roof replaced after the floors go down means covering new work or redoing it. The envelope is not the exciting part and it is not negotiable as a starting point.

Do we need to move everything out?

Not everything and not all at once. We work room by room where the scope allows, and we will tell you what needs to be out of a space before we start on it rather than on the morning we arrive.

What happens when you find something unexpected?

On a house-wide job something is always found - old wiring, a soft subfloor, a roof that has been patched rather than replaced. We show you, price it, and get your decision in writing before we carry on. Nothing gets buried and nothing gets billed as a surprise.

Can we do it in phases over a few years?

Yes, and for a lot of families that is the sensible answer. The thing worth planning centrally is the order - doing the envelope in phase one protects everything you spend in phases two and three.