The room where birthdays, holidays and ordinary Tuesdays happen.
A kitchen is the only room the whole house walks through. Ours are planned around that — how you actually move through it, where the light lands, and how long you have to live without it.
A kitchen is the only room the whole house walks through.
Every other room has a door you can close. The kitchen is where the day starts, where homework happens on the counter because the table is covered, and where everyone ends up standing at a party regardless of how much space you gave them elsewhere. When it works badly, it works badly several times a day — which is why it is usually the first room people ask us about, and the one they regret waiting on.
Featured project
A galley kitchen that stopped wasting its own length
The working run — sink, dishwasher, drawers
A galley kitchen is mostly a corridor, and the mistake is to treat the whole of it as work surface. Here the working run — sink, dishwasher, drawers — was concentrated on one wall so the other side stays clear as a route through to the garden door. The counter was carried unbroken past the sink to give one genuinely usable stretch rather than three interrupted ones, and the backsplash tile runs the full height under the uppers so there is no painted strip to keep clean.
Scope
Cabinetry, counters, backsplash, sink and faucet, flooring, paint
Most kitchens do not need more square footage, they need the appliances and storage in a sensible order. When the toaster, the kettle and the mail all have somewhere to live, the counter you already own comes back.
A single ceiling fixture puts your own shadow on the chopping board. Under-cabinet lighting on the work surfaces, and switching split so the room can be bright or quiet, changes how the kitchen feels after dark more than any finish does.
Widening an opening or moving one wall is often the difference between cooking alone and cooking with the room. It is also the part that needs deciding early, because it changes the sequence of everything after it.
Quartz does not need sealing, luxury vinyl plank tolerates a dropped pan and a wet dog, and a tiled backsplash wipes down rather than staining. None of that is glamorous. All of it is why the room still looks like this in five years.
The single most valuable thing a plan buys you is sequence. Counters templated while the cabinets cure, flooring after the wet work, paint before the hardware. Done in the wrong order the same kitchen takes twice as long and you lose it twice.
Five steps, and you will know which week is the hard one.
01
A conversation
What is not working, and roughly what you are hoping to spend. Kitchens vary more by scope than by taste, so this is mostly about whether walls are moving.
02
We walk the kitchen
Where the plumbing and gas actually run, whether the panel can take another circuit, and what is behind the wall you want opened. This is where surprises get found instead of discovered later.
03
Scope and estimate
In writing, itemised, with the cabinet and counter allowances stated separately so you can see what a finish choice costs before you make it.
04
We build it
Cabinets, then counters templated to what was actually installed, then tile, then flooring, then paint and hardware. You will have a temporary sink arrangement for part of it, and we will tell you which part before we start.
05
You get your kitchen back
Walkthrough with the drawers and doors adjusted, the caulk lines checked, and anything on the list fixed before we invoice the balance.
Materials & craftsmanship
What it is made of, and how it was done.
TileSet to a plane, not to a wallAn old wall is never flat. Tile laid straight onto it telegraphs every hollow along the grout lines. We float the substrate first, which is invisible in the finished room and the reason the light runs evenly across it.
StoneTemplated to the cabinets that existCounters are measured after the boxes are set and levelled, not from the drawing. It costs a few days in the middle and it is why the seam sits where it should and the overhang is even end to end.
CabinetryJudged by the box, not the doorThe door is what you look at; the box is what fails. Plywood carcases, full-extension runners and doors hung with adjustable hinges so they can be brought back into line years later.
HardwareDrilled from a jig, every timePulls set by eye are out by two millimetres and the eye finds it immediately across a run of drawers. A jig is slower on the first door and faster on the twentieth.
Questions homeowners ask
The things people ask before they call.
Do I need a permit to remodel a kitchen?
For a like-for-like replacement of cabinets, counters and finishes, usually not. Once you move plumbing, add circuits, or take out any part of a wall, Tuolumne County will want a permit — and you want one too, because it is what proves the work was inspected when you eventually sell. We handle the application and the inspections as part of the job.
How long will I be without a kitchen?
For a straightforward remodel, plan on three to five weeks with the sink out of action for part of it. The honest answer for your kitchen comes after we have seen it, because the variable is almost never the cabinets — it is what we find behind the wall and how long the counter fabricator takes once the template is cut.
Can I stay in the house while you work?
Almost always, yes, and most people do. We will set up a temporary arrangement for washing up before we take the sink out, and we will tell you which week is the disruptive one so you can plan around it rather than discover it.
How do you handle dust?
Plastic at the openings, floor protection on the routes we walk, and clean-up at the end of each day rather than at the end of the job. Renovation is dusty and we would rather say so than promise otherwise — what we will promise is that you get the rest of your house back every evening.
What happens if I change my mind halfway through?
It depends entirely on when. A finish or hardware change before the order goes in costs nothing. Moving a cabinet run after the counters are templated means new counters. We will always tell you the cost of a change before we make it, in writing, and nothing gets built off a conversation.
Will a kitchen remodel add value to my home?
A kitchen is consistently one of the better returns in a remodel, but we would not sell you one on that basis. If you are remodelling to sell within a year, tell us and we will keep the scope tight and the finishes neutral. If you are staying, build the kitchen you actually want.
No obligation and no sales visit. We will look at the room, tell you what it
involves, and put a number in writing.
Before you look around
We would like to count visits to this site so we know which work people
actually want to see. It is anonymous, it is never used for advertising,
and nothing is sent unless you say yes.
What we collect