Carrara marble walk-in shower with a built-in niche, a tiled bench and a small mosaic floor falling to a centre drain
Featured Marble walk-in shower Tuolumne County
Bathroom remodeling

The first room you use every morning should not be the one you have given up on.

Bathrooms are the smallest rooms in the house and the least forgiving work in it. Almost everything that goes wrong in one goes wrong behind the tile, years later, where nobody was looking when it was built.

You are in it before you are properly awake.

Nobody tours a bathroom. It is not the room you show people. It is the room you stand in at six in the morning, half asleep, noticing the grout you have been meaning to do something about for four years. A bathroom does not have to be large or expensive to stop being the thing you apologise for — it has to be built properly and finished carefully, and those are the two parts you cannot see once it is done.

What changes

What you actually get back.

01

A room that dries out

Most tired bathrooms are damp bathrooms. Extraction that actually moves air, a surround that is sealed rather than caulked over, and a floor that can be wiped — the room stops smelling like a bathroom.

See this in a finished kitchen
Remodeled family bathroom with a white shaker vanity, framed mirror and a two-light fixture above it
02

Storage that is not a shelf over the toilet

A vanity with real drawers, a niche in the shower instead of a basket hanging off the mixer, and somewhere for towels that is not the back of the door.

See this in a finished kitchen
03

Light you can shave and make up in

One ceiling fixture puts your own shadow on your face. Light at the mirror, at the right height, changes the room more than any finish in it.

See this in a finished kitchen
04

A shower you can get into later in life

A low or level threshold, a bench, and blocking in the wall for a grab rail — fitted now or not, but blocked for. It costs almost nothing during the build and is close to impossible afterwards.

See this in a finished kitchen
05

Work that stays behind the tile

The failures in a bathroom are almost never cosmetic. They are water finding a way through a joint that was rushed, and they surface two years later as a soft floor in the next room.

See this in a finished kitchen
How it goes

Five steps, and you will know which week is the hard one.

  1. 01

    A conversation

    Whether this is the only bathroom in the house is the first question, because it changes the whole plan and most of the timeline.

  2. 02

    We open what we can see

    Age of the supply and waste, whether the subfloor around the pan is sound, and where the vent actually terminates. Bathrooms hide more than any other room and we would rather find it now.

  3. 03

    Scope and estimate

    In writing, with the tile and fixture allowances separate, and an honest note about what we might find once the surround is out.

  4. 04

    We build it

    Rough plumbing, then waterproofing, then tile, then fixtures. The order is not negotiable — everything that shows depends on the two stages you will never see again.

  5. 05

    You get the room back

    Walkthrough with the doors adjusted, the silicone lines checked, and the fall to the drain tested with water rather than with a nod.

Materials & craftsmanship

The parts you will never see again.

Large-format marble-look floor tile newly laid in an empty bathroom, with the toilet flange open and the supply stub capped
Sequence The floor goes down before anything sits on it Tile laid and the drain set while the room is still empty. Doing it in this order means the floor runs unbroken under the fixtures instead of being cut around them, and there is no seam at the base of the pan for water to find in ten years.
Tub surround in large-format marble-look panels with a black framed shower door
Surface Fewer joints is fewer places to fail Large-format panels in a tub surround mean a fraction of the grout of a small tile — less to seal, less to clean, and far less to go wrong. The dark frame on the door is the only hard line in the room, which is what makes it read as deliberate.
Remodeled family bathroom with a new white tub and shower surround beneath a window, and plank flooring
Standard The ordinary bathroom gets the same build Not every bathroom is a marble one, and it should not have to be. This one is a stock surround and a stock vanity — set level, sealed properly, with the floor run through and the trim returned cleanly at the door.
Questions homeowners ask

The things people ask before they call.

Do I need a permit for a bathroom remodel?

Replacing a vanity, a toilet or a surround in the same place usually does not need one. Moving the toilet or the shower drain, adding circuits, or opening a wall does. Tuolumne County will want to inspect the rough plumbing before it is covered, which is the inspection worth having — it is the one that looks at the part you will never see again.

How long will the bathroom be out of use?

Two to four weeks for a full remodel, and the honest number depends on tile and on what is behind the old surround. If it is the only bathroom in the house, tell us at the first conversation — we sequence those differently and we will tell you exactly which days it is out.

Can you remodel the only bathroom in the house?

Yes, and we do it regularly. It changes the plan rather than the price: we stage the work so the room is unusable for the shortest possible run of days rather than for the whole job, and we tell you which days those are before we start so you can make arrangements.

What do you do about waterproofing?

It goes in before the tile and it is the reason the room lasts. A shower is a container before it is a finish — the pan, the joints and the wall behind the tile all have to be sealed as a system. Almost every failed bathroom we are called to fix failed there, not at the surface.

Will you find something behind the old shower?

Sometimes, and it is usually a soft subfloor or a leaking valve that has been weeping quietly for years. We will show you, tell you what it costs to put right, and get your decision in writing before we carry on. What we will not do is tile over it.

Can you make the bathroom easier to use as we get older?

Yes, and the cheapest time is now. A low threshold, a bench, a handheld on a slide bar, and blocking in the walls for grab rails — whether or not the rails go in today. Blocking costs almost nothing while the wall is open and is a rebuild afterwards.

Start a conversation

Tell us what is not working.

No obligation and no sales visit. We will look at the room, tell you what it involves, and put a number in writing.

JPG, PNG, or WebP, up to 8MB.