Bathroom remodel

The floor went down before anything sat on it

Large-format floor tile laid and the drain set while the bathroom was still empty — photographed mid-installation.

Large-format marble-look floor tile newly laid in an empty bathroom, with the toilet flange open and the supply stub capped
Floor down, flange set, nothing fitted yet
The record

This is the stage almost nobody photographs, and it is the stage that decides whether the room lasts. The tile is laid across the whole floor while the room is empty, so it runs unbroken beneath where the toilet and vanity will sit rather than being cut tightly around them. The flange is set to the finished floor height at this point, not shimmed up to it afterwards — which is the difference between a seal that lasts and one that weeps quietly into the subfloor.

One photograph of this job, taken mid-installation.

Scope
Bathroom floor tile and drain setting, mid-renovation
Materials
Large-format marble-look porcelain floor tile
Type
Bathroom remodel
Location
Tuolumne County
More about bathroom remodeling
Documentation

What to look at, and why it was done that way.

  1. 01

    Unbroken under the fixtures

    The floor runs beneath the toilet and vanity rather than being cut around them, so there is no seam at their base.

  2. 02

    Flange set to the finished height

    Set level with the tile it sits in, not packed up to reach it afterwards.

  3. 03

    Supplies capped, room empty

    Nothing is fitted until the floor is down and cured. Working the other way round is faster on the day and worse for a decade.